Week 2 Log

June 8th - June 12th

During this past week, I mainly focused on the Spectro-Polarimeter project. I tested out the measurement capabilities of the instrument and started a MATLAB code to analyze the data. Another important step was learning how to calibrate the equatorial mount on which the Spectro-Polarimeter rests.

FieldSpec Pro Documentation

Astro-Physics Equatorial Mount

Equatorial Mount Keypad