I spent most of the week analyzing data from previous measurements and preparing for the midterm presentation. The instrumentation also yielded a number of challenges. In particular, the equatorial mount for the Sprectro-Polarimeter project stopped working. It was not until Thursday that I was able to find the problem and correct it. The problem was an improper connection between the power cable and the mount power source.
Despite the problems with the equatorial mount and preparations for the midterm presentations, I identified an interesting comparison between measurements on June 23rd and July 2nd. Both of these days use the same integration time (136 ms) and gain settings (10 for both SWIR1 and SWIR2 detectors).