SSOC Tohban Report for Week 06 ( 6 Feb - 12 Feb 1995) SSOC: MORIMOTO, K. & SUEMATSU, Y. KSC : SHIBASAKI, K., YOSHIDA, T., & SHIMOJO, M. 1. Solar Activity ------------------------------------------------------------ Solar activity becomes gradually lower in this week. Some C class and B class flares occurred at NOAA 7834. NOAA 7834 is now beyond the limb. 2. Standard Operations -------------------------------------------------------- 2.1 SXT Table Uploads KSC Time (start) in JST Pass# Table ID 8-Feb-95 15:15 3 950208 P3 ARS1 DARKCAL 9-Feb-95 13:52 2 950209 P2 ARS2 STD+LONG 10-Feb-95 14:11 3 950210 P3 FIX STD+LONG 11-Feb-95 14:31 3 950211 P3 ARS1 STD+LONG 2.2 STT Timer Set STT Timer was set at the 2nd contact on Tuesday, Feb 7. 3. Special Operations ------------------------------------------------------- No special operation. 4. Errors & Problems -------------------------------------------------------- 4.1 SXT and BCS errors. BCS error occurred on pass 950208-0206, which was recovered successfully on the following pass. 4.2 Problems When starting the RASM, we had a message: "You are #3 in the queue. Do you want to wait?", and could not proceed ahead. This happened on Feb. 9 and was recovered after Greg-san called JPL. They did not explain the reason. 5. DSN Communications ------------------------------------------------------ 5.1 DSN Strawman Schedule for W09 There were 15 DSN conflicts with ASUKA in the strawman schedule. YOHKOH gets 7 of them and ASUKA has 8. We canceled a total of 25 DSN contacts from the strawman schdule. 5.2 DSN Forecast Schedule for W08 We canceled a total of 11 DSN contacts from the forecast schdule. 5.3 DSN Final Schedule for W07 There was no cancellation for W07. 5.4 DSN Final Schedule for W06 We cancelled 4 DSN contacts from the final schedule because they were very close to next contacts. 6. Yohkoh/ASCA Pass Conflicts -------------------------------------------- In week 06, we lost the following KCS passes used by ASCA: 950208-0516 (4th pass of Feb 08, from 07:57 UT) 950209-0414 (3rd pass of Feb 09, from 06:34 UT) 950209-0517 (4th pass of Feb 09, from 08:17 UT) 950210-0514 (4th pass of Feb 10, from 06:54 UT) 7. Holiday Schedule ------------------------------------------------------- The next operational holiday will be on Monday, Feb 20, when KSC will back up GEOTAIL operation. 8. Hikitsugi Items -------------------------------------------------------- 8.1 Tohbans for Week 07 KSC : SHIMOJO M. and KUMAGAI SSOC : MIYASHITA M. and SAKAO T. 8.2 STT timer setting The next STT timer set is due on Tuesday (14-Feb-95). 8.3 DSN Data: There is no delay. 8.4 GBO mail list PLease delete following two addresses from the GBO mailing list: altrock@sunspot.noao.edu, according to the request by himself, and muller@mesioa.obspm.fr, because of user unknown. 8.5 Terminators SXT Chief Observer is asking the toban; we should obseerve all possible terminators this week. As soon as the orbital elements are available, OP_FIRST_GUESS should be run for all days through Saturday, 18 Feb, so that the terminator predictions will be available for use by the SXT Chief Observer.